- 相關推薦
應聘總經理英文簡歷模板(2)
- Set up time line and successfully launched production for transferred products within deadline.
- Met with customers, vendors, and government officials to develop successful China operations.
- Developed departmental budgets for capitalized equipment and other expenses.
Resident Expatriate At Jacobs-Suzhou Facility
- Assisted GM in defining business plans and objectives, led team to take actions and execute plans.
- Developed plans and drove for actions in continuous improvement of operational performance and cost reduction projects.
- Monitored and supported existing operations to meet targets in quality, quantity, cost and delivery.
- Drove Lean manufacturing initiatives throughout manufacturing areas.
- Implemented and maintained manufacturing quality systems.
- Directed for new product development, sampling, testing and pilot running.
- Led cross functional team to launch new products and met goals in quality, cost, productivity and capacity.
- Supported and managed in localization projects and worked with suppliers to resolve technical issues.
- Coordinated and supported in marketing, sales, human resource, logistics and recruiting efforts.
- Managed in maintaining good relationship with customers, suppliers and local officers.
TechStyle Inc., Piedmont, South Carolina, USA. (1993-1995)
Mechanical Engineer
- Analyzed data to create and develop specifications and design concepts.
- Applied computer aided design and drafting skills to design new products.
- Performed kinematics and dynamics analysis as well as finite element analysis.
- Made detailed and layout drawings, documented design records and bill of materials.
- Worked with other engineers as a team to build prototypes.
- Assembled and tested prototypes, made design alternation if necessary.
- Modified and upgraded existing products for better performance.
Shangrao Automotive Company, Jiangxi, China (1990-1992)
Design Engineer
- Hands-on machine operation and general practice.
- Designed and developed tooling and fixtures.
- Made detailed and assembly drawings.
- Documented design records and created bill of materials.
- Worked with other engineers as a team to build fixtures.
- Assembled and tested fixtures, made design alternation if necessary.
- Modified existing tooling and fixtures.
EDUCATION:
- Master of Science, Mechanical Engineering (May, 1995) - Clemson University, Clemson, SC, USA.
- Bachelor of Science, Mechanical Engineering (July, 1990) - Jiangxi Polytechnic University, P.R.China.
TRAINING:
- Extensive Lean Manufacturing training by Mr. Nakao, Shiqijishu Consulting Firm (December, 1995)
- Extensive Lean Manufacturing training by Mr. Nakao, Shiqijishu Consulting Firm (September, 1996)
http://m.msguai.com/【應聘總經理英文簡歷(2)】相關文章:
總經理述職報告(2)05-29
公司總經理寄語大全(2)09-22
精選總經理述職報告范文(2)07-28
企業(yè)總經理述職報告(2)10-06
應聘秘書的筆試題及答案(2)10-27
應聘簡歷的四大殺手(2)08-08
總經理年終述職報告(2)09-03
應聘時英語自我介紹范本2篇10-12
應聘時面試技巧和注意事項(2)08-31
外企求職:記者應聘世界500強(2)04-25